CFL SG 1610 Surge Generator
The CFL SG 1610 is a medium-voltage surge generator designed for efficient and safe cable fault location on LV and MV networks up to 16 kV. Delivering up to 1000 J surge energy per pulse, it interfaces with CFL prelocators and pinpointing receivers to locate open-circuit, short-circuit and high-resistance faults with precision. Its portable wheeled design and integrated safety features make it ideal for both field service and test bay environments.
Key Features
-
Output voltage: 0–8 kV / 0–16 kV selectable
-
Surge energy: 1000 J per range
-
Supports TDR, SIM, ARM, and MIM methods with CFL PL series prelocators
-
Compatible with PP3 pinpointing system for accurate fault location
-
DC Hi-Pot and Burn-Down modes for insulation and fault conditioning tests
-
Integrated earthing and discharge safety circuits
-
Built-in current coupler for distance measurement synchronization
-
Compact air-cooled design with heavy-duty transport wheels
Technical Specifications
| Parameter | Specification |
|---|---|
| Output Voltage | 0–8 / 16 kV (selectable) |
| Surge Energy | 1000 J (each range) |
| Output Current | Max 240 mA |
| Input Supply | 230 V AC ±10 %, 50 Hz ±1 %, 1.5 kVA |
| Impulse Rate | Manual / 3 s / 6 s / 9 s |
| DC Withstand Test | 0–16 kV, 10 mA |
| Burn-Down Current | 60–240 mA |
| Discharge System | Automatic internal discharge |
| Dimensions | 760 × 650 × 800 mm |
| Weight | ≈ 85 kg |
| Cooling | Air-cooled |
| Environment | 0–50 °C, ≤ 95 % RH |
Standard Accessories
-
HV output cable (5 m)
-
Earth cable (5 m)
-
Mains power cable (3 m)
-
Safety discharge rod
-
User manual & test certificate
Optional Accessories
-
Longer HV leads (10–25 m)
-
CFL PP3 pinpointing system
-
PL Series TDR Prelocator (PL2+, PL3, PL4)
-
CFL CIS cable identification system
-
HV earthing kit for enhanced safety compliance
Applications
-
Location of open, short, high-resistance, and intermittent faults
-
Testing and conditioning of LV/MV underground power cables
-
Integration with PL and PP3 systems for complete fault location workflow
-
Utility maintenance, electrical service contractors, and testing depots
.png)

